Category Archives: Rehab Engineering and Assistive Technology

Rehab engineering workshop under construction in Anniston

Construction is currently under way on a new rehabilitation engineering work and storage space for the Anniston area. The 864-square-foot workshop, which is being built behind the ADRS facility on Coleman Road in Anniston, will include a 24′ x 24′ workshop with work benches and a wash-out sink as well as a storage loft. The outside will feature water access

Read more

Construction continues on Tuscaloosa facility (photo gallery)

The view from the second floor

  Work is progressing on the 56,000-square-foot facility that will house the ADRS offices in Tuscaloosa. The complex, owned by Easter Seals West Alabama, will boast three floors, with Alabama’s Early Intervention System offices and Children’s Rehabilitation Service offices and clinic space occupying the first floor and office space for Vocational Rehabilitation Service and State of Alabama Independent Living (SAIL)/Homebound on

Read more

Printer adds new dimension to rehab technology

The 3D printer creates a part for a cell phone/tablet holder

A new gadget is giving the department’s rehabilitation technology specialists another way to create assistive technology devices for consumers. The new LulzBot TAZ 5 3D printer allows rehab tech specialists to design and then print assistive devices customized to meet the individual needs of consumers. 3D printers use plastic to generate successive layers and create an object. Different grades of plastic are used to

Read more